← Back to all stories
The US Grid Wasn't Built For This
The US Grid Wasn't Built For This Authored by Tejasri Gururaj via Interesting Engineering, Global data center power demand is projected to hit 84 GW by 2027—a 50 percent jump from 2023 levels—with AI workloads accounting for 27 percent of that total, according to Goldman Sachs Research. The grid is strained…
Read full article at Zerohedge →